| |
 |
|
|
|
|
|
|
|  | - Alameda, California
- Total Acreage: 2,676
- BRAC Year: 1993
- Closure Date: 30 Apr 1997
- Action: Closure - Completing BRAC disposal and environmental actions.
|  |
View/Hide Base Summary
| |
|
|
Base Property and Historical Use The Naval Air Station (NAS) Alameda, now commonly referred to as Alameda Point, is a site consisting of 2,675 acres of land (1,560 uplands and 1,115 submerged) situated immediately southwest of the central business district of Oakland and located in the City of Alameda. Alameda Point is bordered on the north by the Oakland Inner Harbor or Estuary, on the west and south by San Francisco Bay and the east by the remaining two-thirds of the City of Alameda. The south and west portions of Alameda Point provide a panoramic vista of the Bay Bridge and the City of San Francisco. In 1936, the United States Government purchased 1,000 acres from the City of Alameda for the future NAS Alameda. NAS Alameda was commissioned in 1940 and supported the Department of the Navy's defense mission until operational closure. Prior to its closure, NAS Alameda was homeport to two nuclear carriers and two nuclear cruisers and performed operations level maintenance of these ships. NAS Alameda contains a National Register eligible World War II Historic District and is currently a host to the USS Hornet museum via lease to City of Alameda.
|
|
|
Closure date, planned reuses, parcels transferred NAS Alameda was identified for BRAC closure in 1993. Mission cease date was 31 January 1997 and operational closure occurred on 30 April 1997. The Local Redevelopment Authority, the Alameda Reuse and Redevelopment Authority (ARRA), and the Department of the Navy (DON) executed an Economic Development Conveyance Memorandum of Agreement (EDC MOA) in 2000 which simultaneously conveyed the first parcel, a 73 acre property known as East Housing. The EDC MOA also authorized the lease of all property west of Main Street to the ARRA (with the exception of parcels intended for federal-to-federal transfer) to create interim reuse and generate revenues to support redevelopment. The Lease gives the ARRA authority to determine which subleases are appropriate and in exchange provides security and maintenance for the entire leased premises.
In March 2008, the Navy conveyed the former Marina Village Housing area to the United States Coast Guard.
In May 2009, the DON conveyed the Public Benefit Conveyance Parcel known as PBC-1 (44 acres) to the Department of Interior. Ultimately, PBC-1 will be transferred to the City of Alameda for a community recreation/ sports complex.
|
|
|
Remaining Disposal Work A considerable portion of the property is slated for transfer to ARRA
(approximately 1,679 acres). The ARRA terminated its relationship with its
master developer, SunCal Companies, in July 2010 and is currently conducting
community meetings to solicit input on the future development plan for the
former Naval Air Station. This page will be updated once the development plan
and the conveyance strategy for the ARRA property are finalized.
(Updated 20 September 2010)
|
View/Hide Restoration Advisory Board (RAB) / Community Meeting Information, Documents and Minutes
| |
|
|
Meeting Information RAB meetings are held from 6:30 p.m. to 9:00 p.m. on the first Second Thursday of odd numbered months. Location - City of Alameda offices, 950 West Mall Square, Building 1, Room 140, Alameda, CA.
|
|
|
|
Scheduled Meetings
|
|
|
Thursday, January 10, 2013 at 6:30 PM
|
|
|
Thursday, March 14, 2013 at 6:30 PM
|
|
|
Thursday, May 09, 2013 at 6:30 PM
|
|
|
Thursday, July 11, 2013 at 6:30 PM
|
|
|
Thursday, September 12, 2013 at 6:30 PM
|
|
|
Thursday, November 14, 2013 at 6:30 PM
|
| |
|
|
Point of Contact
BRAC Environmental Coordinator Derek Robinson Base Realignment and Closure Program Management Office, West 1455 Frazee Road, Suite 900, San Diego, CA, 92108-4310 Phone: (619) 532-0951 Email: derek.j.robinson1@navy.mil
|
| |
|
|
RAB Application & Rules Member Application RAB Rules
RAB / Community Meeting Minutes Click on the corresponding arrow ( ) to view documents for that year.
2013 2012 2011 2010 2009 2008 2007 2006 2005
|
View/Hide Information Repository
| |
|
|
Alameda Reuse and Redevelopment Authority 950 W. Mall Square - Building 1, Room 240, Alameda, CA, 94501-5012 Hours: Mon - Fri 8:30am - 5:00pm
Phone: (510) 749-5800
|
View/Hide All Documents
All documents prior to 2005 have been archived. The titles of those documents are provided below so that you may request copies from the Navy BRAC Webmaster. Please include the exact title of the document within your request.
To view a specific category, click on the corresponding arrow ( ) to expand and collapse documents. |
| |
Environmental Documents | April 2013, Proposed Plan for Operable Unit 2B Installation Restoration Sites 3, 4, 11 and 21 - PDF, 1 MB
|
|
| March 2013, Proposed Plan for Modified Remedy at IR Site 1 Burn Area - PDF, 3 MB
|
|
| January 2013, Draft Environmental Assessment (EA) for the Transfer of Excess Federal Property and Development of an Outpatient Clinic, Offices, and National Cemetery at the Former Naval Air Station Alameda, California (Cover, Abstract, Executive Summary, and Table of Contents) - PDF, 1.15 MB
|
|
| Draft EA – Chapter 1 (Introduction) and Chapter 2 (Alternatives, Including the Proposed Action - PDF, 1.16 MB
|
|
| Draft EA – Sections 3.0 (Affected Environment and Environmental Consequences), 3.1 (Biological Resources), and 3.2 (Water Resources) - PDF, 893 kb
|
|
| Draft EA – Sections 3.3 (Transportation), 3.4 (Cultural Resources), and 3.5 (Visual Resources) - PDF, 3.3 MB
|
|
| Draft EA – Sections 3.6 (Land Use), 3.7 (Air Quality), and 3.8 (Greenhouse Gas Emissions) - PDF, 889 kb
|
|
| Draft EA – Sections 3.9 (Socioeconomics), 3.10 (Hazards and Hazardous Substances), and 3.11 (Utilities) - PDF, 1 MB
|
|
| Draft EA – Sections 3.12 (Noise), 3.13 (Public Services), and 3.14 (Geology and Soils)- PDF, 987 kb
|
|
| Draft EA – Chapter 4 (Cumulative Impacts) - PDF, 1.3 MB
|
|
| Draft EA – Chapter 5 (Other Considerations) and Chapter 6 (List of Preparers) - PDF, 126 kb
|
|
| Draft EA – Appendix A (EA Public Involvement) - PDF, 2.5 MB
|
|
| Draft EA – Appendix B (Biological Resources Supporting Information) - PDF, 36 MB
|
|
| Draft EA – Appendix C (Wetland Delineation & Preliminary Jurisdictional Report) - PDF, 7.2 MB
|
|
| Draft EA – Appendix D (Transportation Impact Study) - PDF, 2.6 MB
|
|
| Draft EA – Appendix E (Cultural Resources Supporting Information) - PDF, 552 kb
|
|
| Draft EA – Appendix F (Air Quality and Greenhouse Gas Supporting Information) - PDF, 485 kb
|
|
| Draft EA – Appendix G (Noise Assessment Worksheets) - PDF, 203 kb
|
|
| Draft EA – Appendix H (Geotechnical Assessment Report) - PDF, 9.5 MB
|
|
| November 2012, Alameda Point Petroleum Program Update - PDF, 741 kb
|
|
| September 2012, Proposed Plan for Operable Unit 2C Installation Restoration Sites 5, 10, and 12 - PDF, 2.8 MB
|
|
| March 2010, Final Community Involvement Plan Update Alameda Point - PDF, 1.6 MB
|
|
| December 2009, FINDING OF NO SIGNIFICANT IMPACT (FONSI) For the Disposal and Reuse of the North Housing Area at Naval Air Station Alameda - PDF, 160 kb
|
|
| November 2009, Final Record of Decision for Installation Restoration Site 1, 1943-1956 Disposal Area - PDF, 5.6 MB
|
|
| October 2009, Final Environmental Assessment for the Disposal and Reuse of the North Housing Area at Naval Air Station Alameda - PDF, 12 MB
|
|
| July 2009, Draft Environmental Assessment (EA) for NAS Alameda North Housing Disposal and Reuse - PDF, 4.8 MB
|
|
| December 2008, Public Information Meeting Slides: Navy/VA Fed-To-Fed Transfer Former NAS Alameda - PDF, 4 MB
|
|
| November 2008, Final Proposed Plan, IR Site 30 - PDF, 260 kb
|
|
| September 2008, TCRA Action Memo for IR Site 17 Debris Piles - PDF, 1.2 MB
|
|
| June 2008, TCRA Action Memo for IR Sites 5 & 10 Storm Drain - PDF, 2.6 MB
|
|
| May 2008, Final Proposed Plan, IR Site 35 - PDF, 3.4 MB
|
|
| March 2008, Final Proposed Plan, IR Site 31 - PDF, 55 kb
|
|
| February 2008, Final Proposed Plan, IR Site 20 - PDF, 1.41 MB
|
|
| November 2006, Final Proposed Plan, IR Site 27 - PDF, 4.41 MB
|
|
| September 2006, Final Proposal Plan, IR Site 1 - PDF, 2.08 MB
|
|
| August 2006, Final Proposed Plan for Soil, IR Site 25 - PDF, 1.3 MB
|
|
| April 2006, Final Proposed Plan, IR Sites 6, 7, 8, and 16 - PDF, 901 kb
|
|
| March 2006, Final Proposed Plan, Site 28 - PDF, 588 kb
|
|
| March 2006, Final Proposed Plan, IR Site 14 - PDF, 597 kb
|
|
| March 2006, Final Proposed Plan, Site OU-5/IR-02 - PDF, 540 kb
|
|
| March 2006, Five Year Review for IR Site 02 and Marsh Crust at FISCA and Marsh Crust & Former Subtidal Area at Alameda Point - PDF, 18.8 MB
|
|
| February 2006, Final Proposed Plan, IR Site 17 - PDF, 1.67 MB
|
|
| October 2005, Final Proposed Plan, IR Site 26 - PDF, 1.44 MB
|
|
| September 2005, Final Proposed Plan, IR Site 15 - PDF, 120 kb
|
|
| February 2005, Final Proposed Plan, Site 29 - PDF, 700 kb
|
|
| December 2001, NTCRA Action Memo for DNAPL and Dissolved Source at IR Sites 4 and 5 - PDF, 4 MB
|
|
|
|
Fact Sheets | December 2011, Fact Sheet - Cleanup Starts at Northwest Seaplane Lagoon - PDF, 517 kb
|
|
| November 2011, Fact Sheet - Five-Year Review of Alameda Point and Fleet and Industrial Supply Center Oakland, Alameda Facility / Alameda Annex - PDf, 573 kb
|
|
| March 2011, Fact Sheet - Remedial Action At Installation Restoration Site 35 - PDF, 496 kb
|
|
| January 2011, Fact Sheet - Cleanup Starts At Seaplane Lagoon - PDF, 223 kb
|
|
| March 2010, Fact Sheet - Remedial Action at Installation Restoration Site 28 Todd Shipyards - PDF, 180 kb
|
|
| November 2009, Fact Sheet - Alameda Point OU-1 IR Sites 6,7,8, and 16 Remedial Design/Remedial Action - PDF, 1.7 MB
|
|
| October 2008, OU-5/IR-02 Remedial Action Fact Sheet - PDF, 540 kb
|
|
| August 2008, IR Site 14 Remedial Action Fact Sheet - PDF, 180 kb
|
|
| July 2008, IR Site 26 Remedial Action Fact Sheet - PDF, 490 kb
|
|
| February 2008, IR Site 17 Remedial Action Fact Sheet - PDF, 430 kb
|
|
| October 2007, IR Sites 5 & 10 Removal Action Fact Sheet - PDF, 1.9 MB
|
|
| April 2006, Five-Year Review for IR Site 02 and March Crust at FISCA and Marsh Crust and Former Subtidal Area at Alameda Point, Fact Sheet - PDF, 459 kb
|
|
|
|
News Letters | |
Press Releases | |
Public Notices | April 2013, Notice of Proposed Plan and Public Comment Period for Operable Unit 2B, Installation Restoration Sites 3,4,11 and 21 - PDF, 56 kb
|
|
| March 2013, Notice of Additional Public Meeting and Extension of Public Comment Period for the Draft Environmental Assessment (EA) for the Transfer of Excess Federal Property and Development of an Outpatient Clinic, Offices, and National Cemetery at the Former Naval Air Station (NAS) Alameda, California - PDF, 17 kb
|
|
| February 2013, Notice of Availability and Announcement of Public Meeting - Draft Environmental Assessment for the Transfer of Excess Federal Property and Development of an Outpatient Clinic, Offices, and National Cemetery at the Former Naval Air Station Alameda, California - PDF, 44 kb
|
|
| September 2012, Notice of Proposed Plan and Comment Period for Operable Unit - 2C, Installation Sites 5, 10, and 12 - PDF, 31 kb
|
|
| July 2010, Public Notice - Proposed Plan and Public Comment Period for Installation Restoration Site 34 - PDF, 131 kb
|
|
| July 2010, Proposed Plan for Installation Restoration Site 34 Former Naval Air Station Alameda - PDF, 757 kb
|
|
| December 2009, NOTICE OF AVAILABILITY - Final Environmental Assessment (EA) and Finding of No Significant Impact for the Disposal and Reuse of the North Housing Area at Naval Air Station Alameda, CA - PDF, 12 kb
|
|
| November 2009, NOTICE OF RECORD OF DECISION - Installation Restoration Site 1 Alameda Point, California - PDF, 566 kb
|
|
| August 2009, Proposed Plan for IR Site 2 - PDF, 530 kb
|
|
| July 2009, Notice of Availability - Draft Environmental Assessment (EA) for Naval Air Station North Housing Disposal and Reuse, Alameda, California - PDF, 320 kb
|
|
| June 2009, Public Statement Regarding Environmental Restoration Program at NAS Alameda - PDF, 33 kb
|
|
| May 2009, Public Notice - Proposed Plan and Public Comment Period for Installation Restoration Site 24 - PDF, 30 kb
|
|
| May 2009, Proposed Plan for Installation Restoration Site 24 Former Naval Air Station Alameda - PDF, 320 kb
|
|
| December 2008, Public Information Meeting Notice - PDF, 40 kb
|
|
| October 2008, Proposed Plan for Installation Restoration Site 30 Soil Former Naval Air Station Alameda - PDF, 260 kb
|
|
|
|
IR Site Status | |
|
View/Hide Image Gallery
| Click on an image to enlarge, or roll cursor over an image for its description. |
|
View/Hide Contact Information
View/Hide Links
|
|
 |
|
|
|
|
|
|