The Navy has prepared a work plan for radiological retesting at Parcel G on HPNS which is available for public comment during a 60-day period beginning June 15, 2018

15 June 2018
Statement: The Navy will collect new data at sites where TtEC had previously gathered radiological data. Cleanup objectives for each parcel were developed early in the Superfund process to prevent exposure to possible radiological contamination in existing soil and buildings, as documented in the Record of Decision (ROD). The rework to collect new data will begin with Parcel G. This new data, including results from soil and buildings that remain at the areas in question, will verify if the property is suitable for transfer. If the new data does not verify the property is suitable for transfer, subsequent work plans will be developed for any additional work and next steps. The public is encouraged to review and comment on the Parcel G work plan (link below) during the 60-day public comment period (June 15, 2018 - August 14, 2018). Written comments to the work plan may submitted to derek.j.robinson1@navy.mil
Statement:  The Navy will collect new data at sites where TtEC had previously gathered radiological data. Cleanup objectives for each parcel were developed early in the Superfund process to prevent exposure to possible radiological contamination in existing soil and buildings, as documented in the Record of Decision (ROD). The rework to collect new data will begin with Parcel G. This new data, including results from soil and buildings that remain at the areas in question, will verify if the property is suitable for transfer.  If the new data does not verify the property is suitable for transfer, subsequent work plans will be developed for any additional work and next steps. The public is encouraged to review and comment on the Parcel G work plan (link below) during the 60-day public comment period (June 15, 2018 - August 14, 2018). Written comments to the work plan may submitted to derek.j.robinson1@navy.mil

The following links are for related documents to parcel G retesting: 1) draft work plan, 2) fact sheet, 3) press release, and 4) Q&As.