The content of this webpage that pertains to federal contracts is furnished for informational use only, is subject to change without notice, and shall not be construed as a commitment by the Government. The Government assumes no responsibility or liability for any errors or inaccuracies that may appear in the content of this document.

Building 123 Demolition
 

Non-Building Demolition

Collapse All Expand All
Expand List item 1724Collapse List item 1724  Basic Contract Information
Expand List item 1725Collapse List item 1725  Request for Proposals (RFPs)

Building Demolition

Collapse All Expand All
Expand List item 1726Collapse List item 1726  General Background

 
Building Demolition Overview
HPNS Parcels
 
 
  • 27 Buildings Demolished Under Comprehensive Environmental Response, Compensation and Liability Act (CERCLA)
    • Identified in the Historical Radiological Assessment and Record of Decisions as buildings where historical radiological activities have occurred
  • 77 Buildings with no CERCLA Requirements
  • Estimating 5-8 years timeframe to complete the demolition program
 
 
 
Building Demolition Phase 1
  • First Phase of Building Demolition is Parcel G Buildings 366, 351, 351A, 401, 411, 439, 408 (slab only)
     
  • Buildings require demolition under CERCLA
    • Buildings identified as potential historical use of radiological equipment or material
    • Buildings were surveyed in 2022, all data is below the goals in the Record of Decision
      • Reports are in progress
Parcel G Phase 1 Demolition  

Environmental Considerations

Structural
  • Buildings several decades old and not occupied or maintained
  • Structural integrity questionable in some areas
Hazardous Materials / Hazardous Waste (HAZMAT/HAZWASTE)
  • Lead in paint and other building components
  • Asbestos-containing material in various parts of the building
  • Possible polychlorinated biphenyls (PCBs) in some fixture
Disposal
  • Accurate manifesting of waste required
  • All waste for first phase will go out of California due to the moratorium on decommissioned waste
  • All waste will go through a radiological portal before leaving base
  • Manifests are signed by authorized Navy personnel
  • All trucks need to be covered entering and leaving
 Maps  

Building 123 - Demolition Example

Building 123 - No longer standing    

Click image to view the time lapse video

Building 123 Videos
Basic Contract - HPNS Building Demolition MACC Solicitation 
Expand List item 1740Collapse List item 1740  Parcel B